Service offered

JoulePAYS For Heating Optimization

Location

Calicut

Project Tenure

6 Years

Facility Type

Hospital

Start Date

July-2019

Achieving 67% Energy Efficiency by October 2022, Resulting in INR 8.8 Million Yearly Cost Savings.

Design Interventions

  • Switched from diesel to electric-based hot water system.
  • Transitioned from a centralized system servicing laundry, sterilization, and domestic hot water uses to a decentralized system servicing individual areas.
  • Moved from external steam to integrated heating systems.
  • Implemented preheating boiler feed water for higher efficiencies.

Equipment Interventions

  • Installed a new 250 kW heat pump for hot water and chilled water generation.
  • Added 4 new washing machines and 3 new flat-bed press machines in the laundry with in-built electric heaters.
  • Installed 3 new electric steamers for the sterilization department.

Operations Interventions

  • Implemented batch-wise monitoring of energy consumption.
  • Optimized cycle times for washing and sterilization to avoid wastage.
  • Continuously monitored the heat pump and boilers on DeJoule.
  • Automated controls of the heat pump and boiler set points for optimal performance.
  • Optimized running hours of the major equipment.

Project Impact:

INR 8.8 Million

Yearly cost savings for eleminated diesel